Barge Canal – Merritt Island
Client: CORE Engineering
Location: Barge Canal – Merritt Island, FL
Description: Subaqueous, HDD, installation of 600 LF of 24″ Fusible-PVC
Kennedy Space Center
Client: CORE Engineering
Location: KSC – Cape Canaveral, FL
Description: K3 Directional Drilling completed two shots of 12″ ductile iron at KSC subaqueously. Shots consisted of 600 LF and 1000 LF
FPL Duct Back – Port St. Lucie, FL
Client: Felix Associates
Location: Port St. Lucie, FL
Description: K3 Directional Drilling completed four shots of 4-8″ and 2-3″ HDPE. Shots consisted of two at 1100 LF and two at 1400 LF
Creek Preserve – Wimauma, FL
Description: K3 Directional Drilling completed the fusing, and installation of 8″ Fusible-PVC for over 3,400 LF.
The Villages Wildwood, FL
Description: K3 Directional Drilling completed a multi-bore, mutli-location Turnpike Crossing project that consisted of:
- +/- 640 LF of 12″ Steel Casing
- +/- 500 LF of 24″ HDPE
- +/- 550 LF of 30″ HDPE
- +/- 640 LF of 36″ HDPE
Turtle Creek – St. Cloud, FL
Description: K3 Directional Drilling completed single shots of 12″, 16″, and 20″ HDPE for 200 LF respectively. In addition K3 installed over 4,000 LF of 24″ HDPE.
Jensen Beach Causeway – Jensen Beach, FL
Description: K3 Directional Drilling completed a project in Jensen Beach which consisted of +/- 780 LF of 4″ HDPE, as well as an 8″ HDPE Water Main +/- 150 LF
Southport Backbone – Port St. Lucie, FL
Description: K3 Directional; Drilling completed a project in Port St. Lucie, FL that included a +/- 350 LF shot of 6″ HDPE, additionally K3 installed +/- 2,500 LF of 24″ Fusible-PVC.
Indrio Rd Extension – Vero Beach, FL
Description: K3 Completed the installation of over 1,300 LF of 12″ HDPE along Indrio road.
Water Bridge – Disney
Description: K3 was able to complete three separate shots at +/- 1,350 LF apiece including 16″ and two 18″ shots of Fusible-PVC.
Hawthorne Swamp – Hawthorne, FL
Description: K3 completed the installation of 6″ SDR-9 pipe for over 2,300 LF through swampland in Central Florida.
PGA Villages, Sable Creek – St. Lucie West, FL
Description: K3 completing the improvements of the potable water system at Sable Creek in the PGA Villages, St. Lucie West. K3 is installing over 70 new water services, fusing and installing nearly 20,000 feet of 8″ pipe.
MCI Bridge – Miami, FL
Description: K3 Completed the subaqueous installation of 2-6″ HDPE pipes across the intercoastal waterway in North Miami for approximately 2,000 feet.
Reclaimed Water Main Extension – DeLand, FL
Description: K3 completing over 9,800 Linear Feet of 18″ Reclaimed Water Main as well as 1″ and 1.5″ Water Services for the City of DeLand.
Grand Park Offsite – Sarasota, FL
Description: K3 completing nearly 20,000 Linear Feet of 20″ Reclaimed Water Main and 20″ Force Main. K3 utilized its Vermeer 220 x 300 S3 and completed the majority of the project through portions of rock and in sections of half-mile long bores.